Fittings, alterations and the real timeline
Nine to twelve months, two to three fittings, and one honest conversation about dates.
Order nine to twelve months before the wedding. A gown is six to eight months in production, then two to three months of fittings.
Gowns are cut to order in sizes 36 to 44 (roughly AU 6 to 14), with custom measurements available. Boutique samples are size 40 and are clipped to you.
Extra lining, added lace, sleeves, straps and neckline changes can be requested, subject to the atelier’s approval, and every change is confirmed in writing by your stylist.
The timeline, honestly
If your date is sooner than this, say so at the first appointment. Rush production is sometimes available and we would rather check before you fall for a gown than after.
What happens at a fitting
The first fitting is structural: the fit through the bodice, the length with your shoes, the position of straps and neckline. This is where changes are decided, not discussed.
The second confirms them and refines. By the final fitting the gown should need nothing except a bustle demonstration — if it still needs work, there is time built in for that.
A made-to-order gown is not finished until it is fitted.
What to bring
What can be changed — and what cannot
Possible: hem and length, taking in and letting out within the seams, added lining, added lace or mesh to close a front or back neckline, sleeves and straps added or removed, support built up.
Not possible: changing the silhouette. The pattern is the gown. If you want a fishtail rather than an A-line, that is a different gown — see silhouettes.
On weight change, tell us rather than hoping. Panelled construction gives room to adjust, and it is easier to plan for at the first fitting than to solve at the last. More detail in the FAQ and the size guide.
Lining and sheerness
Campaign editorial and runway photography shows gowns unlined so the lace and beading read clearly. Every gown that arrives in store is lined through the skirt.
If a style is lined and still sheer, further lining can be added at an additional cost. That is a normal request, not a complaint about the gown.
Questions
How far in advance should I order my wedding dress?+
Nine to twelve months before the wedding. That covers six to eight months of production in the atelier plus two to three months of fittings. Tell us your date at the first appointment and we will confirm whether it works.
How many fittings will I have?+
Usually two, sometimes three. Heavily beaded gowns occasionally need more. The final fitting is when the bustle is set and the gown goes home with you.
What alterations are possible on a Berta gown?+
Hem and length, taking in or letting out within the seams, added lining, extra lace or mesh to close a neckline or back, and sleeves or straps added or removed — subject to the atelier’s approval and confirmed in writing.
What size should I order?+
The size is chosen from your bust, waist and hip measurements against the size chart, the style of the gown, and how firm you want the fit. Gowns are made to order in 36 to 44, with custom measurements available.
What if I lose or gain weight before the wedding?+
Tell your stylist early. Panelled construction allows adjustment at fittings, and it is far easier to plan for at the first fitting than to solve at the last one.
Do I need to bring my shoes?+
Yes — the actual shoes at the actual heel height, because the hem is set against them. Bring the underwear you plan to wear too.
Reading these before your appointment? Tell Google you want our guides first, and Kayrouz Bridal is marked as a preferred source in your results.
Add as a preferred source









